Tuesday, 8 August 2017

Site Progress

The Hall Floor

On Monday 31st July the renovation of the hall floor got underway.  The floor was damaged as a result of flooding during a torrential downpour during the evening 15th September 2016.  Having pulled off the layers of varnish, the site team have made every attempt to dry out the floor, to enable the Brazilian hardwood to be saved.  Over this week the wood blocks will be repaired, sanded and varnished.  I look forward to seeing the results.


Before the renovation


And Now...


Progress with the Shelter


 New Hand Rails